Drive Chain
Adjustment of the Tension on the Drive Chain
[1]
Check that the DRIVE CHAIN is wet with
solution.
[2]
Check that the RACK ASSEMBLY is at
approximately the same temperature as the
solutions in the tanks, to assure that the
DRIVE CHAIN is the correct length.
[3]
Loosen the 4 HOLDING SCREWS.
[4]
Hold the RACK ASSEMBLY above the work
surface until gravity tightens the DRIVE
CHAIN around the TURNAROUND
ASSEMBLY.
[5]
Rotate the DRIVE GEAR one full turn.
[6]
Tighten the 2 HOLDING SCREWS on the
drive side first.
[7]
Place the RACK ASSEMBLY on the work
surface.
[8]
Rotate the ADJUSTING SCREWS until the
distance between the SIDE PLATE of the
RACK and the SIDE PLATE of the
TURNAROUND ASSEMBLY on the non-drive
side is equal to the distance between the
2 SIDE PLATES on the drive side.
[9]
Tighten the 2 HOLDING SCREWS on the
non-drive side.
Remove LINKS from the DRIVE
CHAIN if necessary to provide the
correct length. See steps 1 - 5.
Replacement of the Drive Chain
[1]
To open the existing DRIVE CHAIN, insert a
screwdriver under the HOOKS of a LINK.
Rotate the screwdriver if necessary.
[2]
Attach the new DRIVE CHAIN to the existing
DRIVE CHAIN with the HOOKS in the
direction of travel and the openings of the
LINKS outward. See the illustration.
2-8
NOTE
TURNAROUND
ASSEMBLY
HOOK
[3]
Pull the existing DRIVE CHAIN through the
RACK ASSEMBLY until the new DRIVE
CHAIN is in the correct position.
[4]
Disconnect the existing DRIVE CHAIN from
the new DRIVE CHAIN.
[5]
Connect the ends of the new DRIVE CHAIN.
[6]
Do the Drive Chain Adjustment above.
SIDE PLATE
DRIVE
GEAR
ADJUSTING
SCREW (4)
HOLDING
SCREW (4)
LINK
DRIVE CHAIN
H112_0109CCA
H112_0109CA
981777