Adjustment of the Replenishment Flow Rates
in M35A Processors with Serial No. 10,000 and Above or
in M35 Processors with Serial No. 35,000 and Above
[1]
Remove the TOP COVER.
[2]
Lift the top DETECTOR ROLLER of the
DETECTOR CROSSOVER ASSEMBLY.
[3]
Check that the replenisher solutions flow
freely through the TUBING along the drive
side of the processor.
[4]
Press the METAL LATCH on the red QUICK
DISCONNECT to disconnect the developer
TUBING.
[5]
Pull the TUBING slightly by rotating the
TUBING over the edge of the frame.
[6]
Insert the TUBING into a GRADUATE.
[7]
Lift the top DETECTOR ROLLER of the
DETECTOR CROSSOVER ASSEMBLY for
the correct time, 28 or 34 seconds. See the
table on the next page.
The REPLENISHMENT PUMP will
operate 3 seconds after you release
the DETECTOR ROLLER.
[8]
Check that the amount of developer in the GRADUATE is the same as in the table.
[9]
Adjust the REPLENISHMENT PUMP if necessary. See page 2-39 for the adjustment procedure.
[10]
Do steps 7 - 9 again if necessary.
[11]
Connect the QUICK DISCONNECT.
[12]
Do this procedure again to check the flow rate of the fixer.
2-38
NOTE
TUBING
METAL
LATCH
H112_0114ACB
H112_0114AC
Adjusting the Replenishment Flow Rate
in M35A Processors with Serial No. 10,000 and
Above or in M35 Processors with Serial No.
35,000 and Above
QUICK
DISCONNECT
GRADUATE
981777