Installation

Installation Checklist Monitors

Instrument's specification must conform to your AC power rat-
ings. Do not turn on power until instructed to do so.
100–240 VAC (± 10%), 50/60 Hz (± 5%) or 24 VDC, isolated
(±10%) power outlet with ground connection and 30 VA.
Sample line with sufficient sample flow and pressure (see
ment Specification, p. 10
Mount the instrument in vertical position. Display should be at
eye level.
Connect sample and waste.
Connect all external devices like limit switches, current loops
and pumps.
Connect power cord; do not switch on power yet!
Turn on the sample flow and wait until the flow cell is completely
filled.
Switch on power.
Adjust sample flow.
Program all parameters for sensor and external devices (inter-
face, recorders, etc.).
Program all parameters for instrument operation (limits, alarms).
Let the instrument run continuously for 1 h.
Perform a calibration if necessary, see
Calibration, p.
42.