Mazda CX-9 Grand Touring 2007 Manual page 42

Table of Contents

Advertisement

1. Drain the engine oil. (see ENGINE OIL REPLACEMENT [MZI-3.5] .)
2. Remove the engine and transaxle component. (see ENGINE REMOVAL/INSTALLATION [MZI-
3.5] .)
3. Secure the engine and transaxle component using a hoist and the SST.
4. Remove the dynamic chamber and throttle body as a single unit. (see INTAKE-AIR SYSTEM
REMOVAL/INSTALLATION [MZI-3.5] .)
5. Remove the ignition coils. (see IGNITION COIL REMOVAL/INSTALLATION [MZI-3.5] .)
6. Remove the dipstick.
7. Remove the power steering oil pump drive belt. (see DRIVE BELT REMOVAL/INSTALLATION
[MZI-3.5] .)
8. Remove the power steering oil pump. (see POWER STEERING OIL PUMP
REMOVAL/INSTALLATION .)
9. Remove the timing chain component. (see TIMING CHAIN REMOVAL/INSTALLATION [MZI-
3.5] .)
10. Remove in the order indicated in the table.
11. Install in the reverse order of removal.
12. Start the engine and:
1. Inspect the runout and contact on the pulley and belt.
2. Inspect for engine oil, engine coolant, ATF, power steering fluid and fuel leakage.
3. Verify the ignition timing, idle speed and idle mixture. (see ENGINE TUNE-UP [MZI-3.5] .)
4. Engine accessories operation.
13. Perform a road test.
Fig. 17: Securing The Engine And Transaxle Component Using Special Tool
2007 Mazda CX-9 Grand Touring
2007 ENGINE Cooling System (MZI-3.5) - CX-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents