Mazda CX-9 Grand Touring 2007 Manual page 267

Table of Contents

Advertisement

4
Fig. 121: Identifying No.4 Engine Mount Nut And Bolt Tightening Sequence
Courtesy of MAZDA MOTORS CORP.
ENGINE DISASSEMBLY/ASSEMBLY [MZI-3.5]
1. Remove the transaxle from the engine. (see AUTOMATIC TRANSAXLE
REMOVAL/INSTALLATION [AW6A-EL, AW6AX-EL] .)
2. Remove the drive plate. (see DRIVE PLATE REMOVAL/INSTALLATION [AW6A-EL, AW6AX-
EL] .)
3. Remove the ignition coils. (see IGNITION COIL REMOVAL/INSTALLATION [MZI-3.5] .)
4. Remove the CMP sensor. (see CAMSHAFT POSITION (CMP) SENSOR
REMOVAL/INSTALLATION [MZI-3.5]. )
5. Remove the power steering oil pump. (see POWER STEERING OIL PUMP
REMOVAL/INSTALLATION .)
6. Remove the generator. (see GENERATOR REMOVAL/INSTALLATION [MZI-3.5] .)
7. Remove the fuel injector and fuel distributor. (see FUEL INJECTOR REMOVAL/INSTALLATION
[MZI-3.5] .)
8. Remove the intake-air system. (see INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [MZI-
3.5] .)
9. Remove the exhaust system. (see EXHAUST SYSTEM REMOVAL/INSTALLATION [MZI-3.5] .)
10. Remove the thermostat case and water hose component. (see THERMOSTAT
REMOVAL/INSTALLATION [MZI-3.5] .)
11. Remove the CHT sensor. (see CYLINDER HEAD TEMPERATURE (CHT) SENSOR
REMOVAL/INSTALLATION [MZI-3.5]. )
12. Remove the CKP sensor. (see CRANKSHAFT POSITION (CKP) SENSOR
REMOVAL/INSTALLATION [MZI-3.5]. )
13. Remove the oil pressure switch. (see OIL PRESSURE INSPECTION [MZI-3.5] .)
14. Remove the oil cooler. (see OIL COOLER REMOVAL/INSTALLATION [MZI-3.5] .)
15. Disassemble in the order indicated in the table.
16. Assemble in the reverse order of disassembly.
2007 Mazda CX-9 Grand Touring
2007 ENGINE Mechanical (MZI-3.5) - CX-9
74.5-104.9 N.m {7.60-10.6 kgf.m, 55.0-77.3 ft.lbf}

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents