Courtesy of MAZDA MOTORS CORP.
6. Tighten the bolts on the No.1 engine mounting bracket in the order of A, B.
Tightening torque
93.1-116.6 N.m {9.50-11.8 kgf.m, 68.7-85.9 ft.lbf}
Fig. 117: Identifying No.1 Engine Mounting Bracket Bolts A And B With Torque Specification
Courtesy of MAZDA MOTORS CORP.
7. Tighten the No.1 engine mount bolt C at the specified torque.
Tightening torque
93.1-116.6 N.m {9.50-11.8 kgf.m, 68.7-85.9 ft.lbf}
Fig. 118: Identifying No.1 Engine Mount Bolt C
Courtesy of MAZDA MOTORS CORP.
8. Install the intermediate shaft installation bolt, and disconnect the steering shaft. (see STEERING
WHEEL AND COLUMN REMOVAL/INSTALLATION .)
9. Install the transverse member. (see TRANSVERSE MEMBER REMOVAL/INSTALLATION .)
10. Install the front under cover A and front under cover B. (see FRONT UNDER COVER
REMOVAL/INSTALLATION .)
2007 Mazda CX-9 Grand Touring
2007 ENGINE Mechanical (MZI-3.5) - CX-9