Mazda CX-9 Grand Touring 2007 Manual page 265

Table of Contents

Advertisement

Courtesy of MAZDA MOTORS CORP.
6. Tighten the bolts on the No.1 engine mounting bracket in the order of A, B.
Tightening torque
93.1-116.6 N.m {9.50-11.8 kgf.m, 68.7-85.9 ft.lbf}
Fig. 117: Identifying No.1 Engine Mounting Bracket Bolts A And B With Torque Specification
Courtesy of MAZDA MOTORS CORP.
7. Tighten the No.1 engine mount bolt C at the specified torque.
Tightening torque
93.1-116.6 N.m {9.50-11.8 kgf.m, 68.7-85.9 ft.lbf}
Fig. 118: Identifying No.1 Engine Mount Bolt C
Courtesy of MAZDA MOTORS CORP.
8. Install the intermediate shaft installation bolt, and disconnect the steering shaft. (see STEERING
WHEEL AND COLUMN REMOVAL/INSTALLATION .)
9. Install the transverse member. (see TRANSVERSE MEMBER REMOVAL/INSTALLATION .)
10. Install the front under cover A and front under cover B. (see FRONT UNDER COVER
REMOVAL/INSTALLATION .)
2007 Mazda CX-9 Grand Touring
2007 ENGINE Mechanical (MZI-3.5) - CX-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents