11. Temporarily tighten the No.3 engine mount bolt and nuts in the order shown in the figure.
Fig. 119: Identifying No.3 Engine Mount Bolt And Nut Tightening Sequence
Courtesy of MAZDA MOTORS CORP.
12. Tighten the No.3 engine mount in the order shown in the figure.
Tightening Torque
TIGHTENING TORQUE SPECIFICATION
Installation Position
1, 2, 7
3, 4, 5, 6
Fig. 120: Identifying No.3 Engine Mount Bolt And Nut Tightening Sequence
Courtesy of MAZDA MOTORS CORP.
13. Tighten the No.4 engine mount in the order shown in the figure.
Tightening Torque
TIGHTENING TORQUE SPECIFICATION
Installation Position
1, 2, 3
2007 Mazda CX-9 Grand Touring
2007 ENGINE Mechanical (MZI-3.5) - CX-9
Tightening Torque
74.5-104.9 N.m {7.60-10.6 kgf.m, 55.0-77.3 ft.lbf}
43.1-74 N.m {4.40-7.54 kgf.m, 31.8-54.5 ft.lbf}
Tightening Torque
66.6-93.1 N.m {6.80-9.49 kgf.m, 49.2-68.6 ft.lbf}