Mazda CX-9 Grand Touring 2007 Manual page 158

Table of Contents

Advertisement

If there is continuity, there is a short circuit. Repair or replace the wiring harness.
Throttle body terminal C and power supply
Throttle body terminal C and body ground
Throttle body terminal D and body ground
Throttle body terminal E and power supply
Throttle body terminal F and body ground
Throttle body terminal F and power supply
ACCELERATOR PEDAL POSITION (APP) SENSOR INSPECTION [MZI-3.5]
NOTE:
Before performing the following inspection, make sure to follow the
procedure as indicated in the troubleshooting flowchart. (see HOW TO
USE THIS MANUAL .)
VOLTAGE INSPECTION
1. Turn the ignition switch to the ON position (Engine OFF).
2. Verify that the PCM terminal 1AC, 1AG and 1AK change smoothly while throttle valve is gradually
opened.
If as verified, go to next step.
If not as verified, perform the "Circuit Open/Short Inspection".
If there is no open or short circuit, replace the throttle body.
3. Verify that the PCM terminal 1AC, 1AG and 1AK voltages are as shown in the following table.
Fig. 15: Identifying PCM Connector 1 Terminals
Courtesy of MAZDA MOTORS CORP.
2007 Mazda CX-9 Grand Touring
2007 ENGINE PERFORMANCE Control System (MZI-3.5) - CX-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents