MOTO GUZZI V85 TT Service Station Manual page 99

Hide thumbs Also See for V85 TT:
Table of Contents

Advertisement

V85 TT
THE FOLLOWING OPERATIONS APPLY WHEN
MOUNTING THE RIGHT HAND STEM
Observing the indicated sequence, ex-
tract and remove the dust guard (1),
the seeger ring (2), the oil seal (3), the
ring (4), the guide bushing (5) and the
slider bushing (6).
Insert the complete plunger (7).
Secure the stem in a vice and, after in-
serting the screw (8) used to fasten the
plunger, complete with the copper
washer (9), apply the pre-defined tight-
ening torque.
- Insert the stem in the sleeve.
Suspensions
SUSP - 99

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents