+ (Leading): the inverter is sourcing reactive power to
the grid.
- (Lagging): the inverter is sinking reactive power from
the grid.

7.5.6 Parameter Reset

All settable parameters will return to the default values once the
"Param Reset" operation is performed.
Press ENT to confirm the operation.
Press ESC to discard the operation.

7.5.7 DRM Switch Setting

Touch ENT / ESC to select and press ENT to confirm.
ON: enable the DRM function.
OFF: disable the DRM function. (By default)

7.5.8 GND Detection

Touch ENT / ESC to select and press ENT to confirm.
Select ON to enable the GND Detection. If the
enclosure of the inverter is not grounded, the error
code 106 will be shown on the main screen. The
buzzer inside will sound at the same time.

7.5.9 Energy Adjustment

If the accumulative value "E-total" displayed on inverter screen is different from
the value indicated on the metering device, you should adjust the energy
deviation.
(Energy Adj. value) = (Real measured value) - (E-total reading value)
Touch ESC to add the value and Touch ENT to move
the cursor. Press ENT to confirm the setting.
The "+" can be changed to "-" by touching ESC.
The adjustment rangs from -9999 kWh to +9999 kWh.

7.5.10 Setting Communication Parameter

Touch ESC to set the appropriate value and
touch ENT to move the cursor. Confirm settings
by pressing ENT.
Device address range: 1-247.
7 LCD Operation
PF:
+1.000
Confirm resume
setting?
OFF
ON
OFF
ON
+0000 kWh
Modbus ID: 031
49

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SG2K5-S and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Sg2k-sSg3k-sSg3k-dSg5k-dSg8k-d

Table of Contents