Page 5
WARNING! Disconnect the inverter from all the external power sources before service! Do not touch live parts until 10 minutes after disconnection from the sources. 10 min There is a danger from a hot surface that may exceed 60℃! Danger to life due to high voltages! Only qualified personnel can open and service the inverter.
Page 14
TN-S TN-C TN-C-S Transformer Transformer Transformer L1 L2 L3 N PE L1 L2 L3 N PE L1 L2 L3 N PE Inverter Inverter Inverter Transformer L1 L2 L3 N PE Inverter SG 15K Multiple inputs of MPPTs Transformerless Code of power level Code of PV grid-connected inverter...
Page 29
Ambient Temperature Ambient Temperature -25℃...+60℃ 非隔离型 Non-islolated 逆变器拓扑 Inverter Topology Grid Monitoring:VDE 0126-1-1 阳光电源股份有限公司 阳光电源股份有限公司 SUNGROW POWER SUPPLY CO., LTD. SUNGROW POWER SUPPLY CO., LTD. 中国制造 中国制造 www.sungrowpower.com Made in China www.sungrowpower.com Made in China Applicable to products in countries...
Page 56
Inverter RS485 cable Ethernet cable Com. Data Logger RS485 Ethernet Ethernet port terminal terminal RS485 Communication of inverter ...
Page 58
Inverter Remote monitoring platform Com. Ethernet GPRS module Wireless signal iSolarCloud Communication base station GPRS Communication of inverter Wireless signal...
Page 59
Inverter Remote monitoring platform Com. Ethernet WiFi module Ethernet Router iSolarCloud Wireless signal Ethernet communication connection of the inverter (Via the WiFi module) Inverter Remote monitoring platform Com. Ethernet E-Net module Ethernet Router iSolarCloud Wireless signal Ethernet communication connection of the inverter (Via the E-Net module) ≤...
Page 60
Solar switch Main Meter switch link Network Utility Meter meter grid Load switch PV strings Inverter Home Appliance...
Page 61
Load side Grid side Solar switch Main Meter switch link Network Utility Meter meter grid Load switch PV strings Inverter Home Appliance Solar switch Main Meter Current transformer switch link Network Utility meter grid Load switch PV strings Inverter Meter Commercial Appliance...
Page 62
21 22 17 18 19 20 L1′ L2′ L3′ L1(A) L2(B) Grid side Inverter & load side L3(C) L1(A) L2(B) Grid side Inverter & load side L3(C) 21 22 17 18 19 20 ...
Page 64
21 22 17 18 19 20 L1′ L2′ L3′ Solar switch Main Meter switch link Network Utility meter grid Meter Load switch PV strings Inverter Home Appliance...
Page 86
Active & Reactive power parameters Operation parameters Settings PID control parameters More Protection parameter Firmware update ...
Page 88
General Q(P) curve Default Q(P) curve COS Ф COS Ф Upper PF Capacitive Lower Power Upper Power P/Pn P/Pn =50% =100% Upper PF Cap =1 Power Power Lower Power Upper Power Inductive Lower PF Lower PF Ind =0.9...
Page 90
Q/Sn Upper Q/Sn Ind Hysteresis U2 Limit Upper U limit Grid voltage Lower U limit U1 Limit Hysteresis Lower Q/Sn Cap ...
Need help?
Do you have a question about the SG15KTL-M and is the answer not in the manual?
Questions and answers