Linde 350 Series Service Training page 9

Ic engined truck with linde hydraulic control lhc
Table of Contents

Advertisement

Service Training
- Hold injection pump sprocket in position with drift (2064).
- Loosen tensioner.
- Remove pulley for coolant pump.
- Remove lower toothed belt guard.
- Remove belt guard.
INSTALLATION
- Check and ensure TDC mark on flywheel is aligned with
reference mark.
- Loosen camshaft sprocket bolt (2) by half a turn. Free
sprocket (1) on taper by tapping with hammer (using a
drift through the hole in the rear toothed belt guard).
- Fit toothed belt and remove pin from injection pump
sprocket.
- Install the idling pulley. Torque loading: 25 Nm.
- Turn the tensioning pulley clockwise with a spanner (eg Matra
V159) until the notch and boss (arrows) are in line.
- Tighten the clamping nut at the tensioning pulley. Torque
loading: 20 Nm.
- Recheck if the TDC mark on the flywheel and the reference
mark are in line.
- Tighten fastening screw of valve timing sprocket to 45 Nm.
- Remove the setting bar.
- Turn the crankshaft by two turns in normal direction and
check that the tension of the toothed belt is in accordance
with the specification.
- Install V-belt, toothed belt guard and cylinder head cover.
- Check the point of injection of the injection pump.
Section
1
Page
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H 12 d-03H 18 d-03H 16 d-03H 20 d-03H 18 t-03H 20 t-03

Table of Contents