■ C-3.4.8
Moving the outriggers
CAUTION
Before lowering the outriggers, make sure that
nobody is within the working range of the machine.
To operate the outriggers
Left outrigger (
lever)
•
Press the button on the lever knob
•
Push the left lever to lower the left outrigger to
the ground
•
Pull the left lever to raise the left outrigger.
Right outrigger (
lever)
•
Press the button on the lever knob
•
Push the right lever to lower the right outrigger to
the ground
•
Pull the right lever to raise the right outrigger.
Handler with telescopic boom GTH-3512
OPERATING INSTRUCTIONS
C - 22
Page
Document 57.0008.7200 - 05/2007
Courtesy of Crane.Market