Siemens CP 1515 User Manual page 250

Industrial ethernet wireless lan rlm manager
Hide thumbs Also See for CP 1515:
Table of Contents

Advertisement

5. After approximately 5 seconds, use the small pointed object again to
press the
You will see the LEDs changing color in the range Amber, Red and Green
again.
6. When all LEDs turn Amber, release the
The Power LED turns to Amber. Other LEDs will be off, or may flicker
Green to indicate LAN activity on the associated interface.
7.
Start the RLM Manager program and proceed with
and Uploading Files"
The complete configuration and upload procedure of the forced reload
procedure is pictured in
250
button for approximately 30 seconds.
Figure
45.
Industrial Ethernet Wireless LAN RLM Manager, CP 1515 Manager
button.
"Step 3 - Configuring
C79000-G8976-C171-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic net

Table of Contents