Putting into operation

Mains power supply

The line voltage and the working voltage indicated
on the line adapter must correspond!
Only the pH electrode and the conductivity cell may be
immersed into the same solution!
For first measurement after putting into operation the result of
the test value is displayed some seconds later than during
normal operation.
BA61101/08.00/Pla/MLP5-E2
Connect line adaptor to the power
supply socket of the MultiLab P5.
Plug line adaptor in the mains socket.
Switch on the MultiLab P5.