6.1 Checking Before Power-On

1.
2.
3.
4.
5.
6.
7.
8.
9.
10. Check that the maintenance compartment door is closed and the door screws are
11. Check that unused DC input terminals are sealed.
12. Check that unused USB port is plugged with watertight cap.
13. Check that unused cable glands are plugged and the thread-lock sealing nuts are

6.2 Powering On the SUN2000

Precautions
Before turning on the AC switch between the SUN2000 and the power grid, use a multimeter
to check that the AC voltage is within the specified range.
Issue 02 (2018-10-15)
Check that the SUN2000 is installed correctly and securely.
Check that the DC switch and downstream AC output switch are OFF.
Check that all ground cables are connected correctly and securely.
Check that all AC output power cables are connected correctly and securely, without
open circuits or short circuits.
Check that all DC input power cables are connected correctly and securely, without open
circuits or short circuits.
Check that the communications cable is connected correctly and securely.
Check that all used cable glands at the bottom of the enclosure are sealed, and that the
thread-lock sealing nut is tightened.
Check that the AC terminal cover is reinstalled.
Check that the maintenance compartment interior is clean and tidy, without foreign
matter.
tightened.
tightened.
Copyright © Huawei Technologies Co., Ltd.
6

Commissioning

6 Commissioning
61

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents