Huawei SUN2000-60KTL-M0 User Manual page 58

Three-phase grid-tied pv string inverter
Hide thumbs Also See for SUN2000-60KTL-M0:
Table of Contents

Advertisement

SUN2000-60KTL-M0
User Manual (Europe Edition)
Figure 5-26 Routing a cable
Step 3 Remove the cable terminal base from the terminal block, and connect the communications
cable to the terminal base.
Figure 5-27 Connecting cables to a terminal base
(1) RS485A IN
(3) RS485B IN
Step 4 Land the cables in the terminal block, and bond the shield layer to the ground point.
Issue 02 (2018-10-15)
When connecting the shielded cable, crimp the OT terminal if required.
Copyright © Huawei Technologies Co., Ltd.
(2) RS485A OUT
(4) RS485B OUT
5 Electrical Connections
52

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents