Parameter List
Table 7-5 Parameter description
No.
Parameter
1
Remote
power
schedule
2
Schedule
instruction
valid duration
3
Maximum
active power
Shutdown at
4
0% power
limit
Active power
5
change
gradient
6
Fixed active
power
derated
7
Active power
percentage
derating
Issue 02 (2018-10-15)
Description
If this parameter is set to
Enable, the SUN2000
responds to the remote
power scheduling
instruction. If this
parameter is set to
Disable, the SUN2000
does not respond to the
remote power scheduling
instruction.
Specifies the duration
within which the
scheduling instruction is
valid.
Specifies the output upper
threshold for the
maximum active power to
adapt to various market
requirements.
If this parameter is set to
Enable, the SUN2000
shuts down after receiving
the 0% power limit
command. If this
parameter is set to
Disable, the SUN2000
does not shut down after
receiving the 0% power
limit command.
Adjusts the change speed
of the SUN2000 active
power.
Adjusts the active power
output of the SUN2000 to
a fixed value.
Adjusts the active power
output of the SUN2000 to
a percentage.
Copyright © Huawei Technologies Co., Ltd.
Unit
Value Range
N/A
Disable
Enable
s
[0, 86400]
kW
[0.1, Pmax_limit]
N/A
Disable
Enable
%/s
[0.1, 1000]
kW
[0, Pmax_limit]
%
[0, 100]
7 Man-Machine Interactions
Remarks
N/A
If the value is less
than 60 seconds, the
scheduling
instruction is valid
permanently.
Pmax_limit is the
upper limit of the
maximum active
power.
N/A
Adjust the active
power based on the
percentage of the
rated apparent power.
Pmax_limit is the
upper limit of the
maximum active
power.
If this parameter is
set to 100, the
SUN2000 delivers
power output based
on the maximum
output power.
89

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents