Huawei SUN2000-60KTL-M0 User Manual page 15

Three-phase grid-tied pv string inverter
Hide thumbs Also See for SUN2000-60KTL-M0:
Table of Contents

Advertisement

SUN2000-60KTL-M0
User Manual (Europe Edition)
Label
Issue 02 (2018-10-15)
Name
Delay discharge
Refer to documentation
Grounding
Operation warning
DC terminal operation
warning
SUN2000 serial number
(SN) label
Copyright © Huawei Technologies Co., Ltd.
2 Overview
Meaning
temperatures on the shell.
High voltage exists
after the SUN2000 is
powered on. Only
certified electricians
are allowed to perform
operations on the
SUN2000.
Residual voltage exists
after the SUN2000 is
powered off. It takes
15 minutes for the
SUN2000 to discharge
to the safe voltage.
Reminds operators to
refer to the documents
provided with the
SUN2000.
Indicates the position for
connecting the PE cable.
Do not remove the DC
input connector when the
SUN2000 is running.
High voltage exists after
the SUN2000 is powered
on. To avoid electric
shocks, perform the
following system
power-off operations
before plugging or
unplugging DC input
connectors of the
SUN2000:
1. Send a shutdown
command.
2. Turn off the
downstream AC
switch.
3. Turn off the two DC
switches at the bottom.
Indicates the SUN2000
SN.
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents