Huawei SUN2000-60KTL-M0 User Manual page 59

Three-phase grid-tied pv string inverter
Hide thumbs Also See for SUN2000-60KTL-M0:
Table of Contents

Advertisement

SUN2000-60KTL-M0
User Manual (Europe Edition)
Figure 5-28 Connecting communications cables
Step 5 Bundle communications cables after connecting them.
Figure 5-29 Bundling communications cables
Step 6 Tighten the thread-lock sealing nut and seal the cable gland.
----End
Issue 02 (2018-10-15)
Tie the communication cables with the cables on internal side of the maintenance compartment.