Opening The Maintenance Compartment Door - Huawei SUN2000-60KTL-M0 User Manual

Three-phase grid-tied pv string inverter
Hide thumbs Also See for SUN2000-60KTL-M0:
Table of Contents

Advertisement

SUN2000-60KTL-M0
User Manual (Europe Edition)
Figure 5-1 Crimping the OT Terminal
(1) Cable
(4) OT terminal

5.3 Opening the Maintenance Compartment Door

Precautions
Issue 02 (2018-10-15)
Pay attention not to damage the core wire when stripping a cable.
The cavity formed after the conductor crimp strip of the OT terminal is crimped must wrap
the core wires completely. The core wires must contact the OT terminal closely.
Wrap the wire crimping area with heat shrink tubing or PVC insulation tape. The
following figure uses heat shrink tubing as an example.
When using the heat gun, protect devices from being scorched.
Copyright © Huawei Technologies Co., Ltd.
(2) Core wire
(5) Hydraulic pliers
5 Electrical Connections
(3) Heat shrink tubing
(6) Heat gun
32

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents