Figure 4-3 Installation space requirements
For ease of installing the SUN2000 on the mounting bracket, connecting cables to the bottom of the
SUN2000, and maintaining the SUN2000 in future, it is recommended that the bottom clearance be in
the range of 600 mm to 730 mm. If you have any questions about the clearances, consult the local
technical support engineers.