Sites with a potentially explosive atmosphere.
Installation wall load must be more than 180 kg
2.2 Installation
Step 1: Remove the battery and inverter from the packaging box.
Figure 9 Battery with Lid off - Front View
Step 2: Open battery housing case and remove communication wiring baffle at
the left side.
___________________________________________________________________
Figure 8 Unpacking the inverter and battery
Communication
wiring baffle
Alpha ESS Co., Ltd.
Your Smart Energy
Figure 10 Battery with Lid off – Side View
Page 11 of 40