Alpha ESS Storion-SMILE5 Installation Manual page 21

Energy storage system
Table of Contents

Advertisement

Your Smart Energy
Figure 27 Wiring the Power Cable of the Cable Box
Step 18: Connect the power cable from Step4 to the terminals of cable box.
Make sure that red connects to red and black connects to black.
Figure 28 PV Wiring
Step 19: Close the battery covers and connect the PV MC4 connectors as
shown in the diagram (both sides). At the same time connect all the AC, meter
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 20 of 40

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents