Introduction; Main; Status - Alpha ESS Storion-SMILE5 Installation Manual

Energy storage system
Table of Contents

Advertisement

4.2 Introduction

This part is suitable for EMS firmware-version 1.01.67 and above.
4.2.1

Main

Figure 47 Main Interface
Figure 48 Main Menu
4.2.2

Status

Figure 49 Status Menu
Figure 50 Grid Interface
___________________________________________________________________
Main displays the inverter working status
and information, including:
Power: Total PV power
Total: Total power generation.
Battery: Current remaining battery
power (SOC).
Normal: Current working state of the
equipment, including Standby.
In the Main interface, press ENT key to
enter the Menu main interface.
Through the up and down key, select the
sub-menu, press the ENT key to enter the
select sub-menu, press Return key to
return to the previous layer.
Status menu contains five sub-menus:
Solar, Battery, Grid, UPS and Comm
display the relevant information about the
current
physical
interface respectively.
Grid interface displays the real-time
information on the city electric side:
voltage U, current I, frequency F, P
P
, P
MeterAC
MeterDC
Alpha ESS Co., Ltd.
Your Smart Energy
or
communication
.
Page 30 of 40
,