RMG PGC 9300 Operating Manual page 9

Measuring element
Hide thumbs Also See for PGC 9300:
Table of Contents

Advertisement

• The PGC 9300 complies with current standards and regulations. However,
danger can arise with misuse and the measuring element of the PGC 9300
can be destroyed due to operator error.
1.2.4.2
Dangers during commissioning
Initial commissioning
Note
In accordance with Article 15 of the German Ordinance on Industrial
Safety and Health (Betriebssicherheitsverordnung), Article 5 of German
Social Accident Insurance (DGUV) REGULATION 3 "Electrical systems
and equipment" and generally recognized good engineering practices,
particularly the VDE standards VDE 0100-100 "Construction of low-voltage
systems" and VDE 0165 "Electrical explosion protection", an inspection of
the measuring system must be carried out before the device is commis-
sioned. An acceptance test certificate and corresponding test report must
be created for this commissioning.
These, the operating manual and the CE Declaration of Conformity must
be stored so that they are always readily available. In the process, the en-
tire documentation, including the conformity declarations and certificates
must be checked for completeness.
Danger
This symbol is used in the manual as a warning of the dan-
ger of explosion; observe the instructions following the
symbol.
With the danger of explosion, the following must be observed, in particular:
• Install the device as specified in the operating manual. If the device is not
installed as specified in the operating manual, there may be a risk that other
connected devices do not have adequate explosion protection.
The explosion protection is lost!
The initial commissioning must only be carried out by
specially trained personnel (training by RMG) or RMG
service personnel.
1 About this manual
Manual PGC 9300 EN07 June, 18th 2018
5

Advertisement

Table of Contents
loading

Table of Contents