RMG PGC 9300 Operating Manual page 78

Measuring element
Hide thumbs Also See for PGC 9300:
Table of Contents

Advertisement

Appendix 3: Pre-filter flushing unit
Use new Filter A, Filter B is in operation
74
Manual PGC 9300 EN07 June, 18th 2018
1.
Switch He filter to Pos. A
2.
Open valve A1
3.
Open valve A3
4.
Adjust RM for flushing operation to 10-15 ml. Flush for 24 h
5.
Close valve A3
6.
Close valve B2
7.
Open valve A2
8.
Close valve B1

Advertisement

Table of Contents
loading

Table of Contents