Inspection And Maintenance Tasks; General Information - RMG PGC 9300 Operating Manual

Measuring element
Hide thumbs Also See for PGC 9300:
Table of Contents

Advertisement

1.4 Inspection and maintenance tasks

1.4.1

General information

Note
Explosion-proof electrical control units must be maintained on a regular
basis.
The time intervals for this inspection depend on the operating and environmental
conditions. We recommend at least one inspection per year (e.g. in connection
with the annual calibration of the PGC 9300).
The following recurrent maintenance tasks require knowledge that is described in
the further course of the manual. Therefore, please read the entire manual or
search for the appropriate chapter in the table of contents.
All maintenance intervals and tasks are listed in the accompanying book of
maintenance logs. The measures described there are prerequisite for the cali-
brated operation of the device and any warranty claims.
Note
Manual, book of maintenance logs, acceptance inspection certificate and
test logs must remain accessible within the vicinity of the PGC 9300 and
always readily available (see also chapter 1.2.4.2 Dangers during commis-
sioning).
All measures must be documented, particularly maintenance tasks.
Danger
If it is necessary to open a pressure-proof housing, suitable measures
must be taken to assure that the housing is not exposed to an explosion-
prone atmosphere.
Danger
Work on live equipment in explosion-prone areas is prohibited as a funda-
mental principle (except for intrinsically safe power circuits).
1 About this manual
Manual PGC 9300 EN07 June, 18th 2018
17

Advertisement

Table of Contents
loading

Table of Contents