MI 3152(H) EurotestXC (2,5 kV)
6.1.3 Single test start screen
Figure 6.2: Single test start screen, example of insulation resistance measurement
Options (before test, screen was opened in Memory organizer or Single test main menu)
long
long
on
long on
Accepts the new parameters and limit
values and exits.
Starts the measurement.
Starts the continuous measurement (if applicable on
selected single test).
Opens help screens.
Opens menu for changing parameters and limits.
Refer to chapter 6.1.2 Setting parameters and
limits of single tests for more information.
Enters cross selector to select test or measurement.
Expands column in control panel.
79
Single tests