MI 3152(H) EurotestXC (2,5 kV)
Compensation of test leads resistance procedure
Enter R low or Continuity function.
Connect test cable to the instrument and short the test leads together, see Figure 7.24.
Touch the
Figure 7.25: Result with old and new calibration values
key to compensate leads resistance.
103
Tests and measurements