Download Print this page

Abbott CELL-DYN 3000 Troubleshooting Manual page 258

Sample loader
Hide thumbs Also See for CELL-DYN 3000:

Advertisement

®
CELL-DYN
3/35 Sample Loader TS Guide
VP - 10.1 Tube Positioning Arm Check
Purpose: Perform this procedure to verify Tube Positioning Arm Operation and Alignment,
3-72.
NOTE:E and F Loaders Only - G Loader does not have a Tube Positioning Arm.
1. Before performing this procedure, perform
2. Remove racks from under mixing assembly.
3. Put Sample Loader in Manual Mode.
a. Press and Hold MAN and START.
b. Turn Power ON, hold keys down until BEEPING stops.
4. Set BAR (1/0) Switch to 1.
5. Press MAN to actuate arm.
6. Measure energized and non-energized tube position arm distances from Platen Wall, not Laser
Shield
(Figure
3-72).
F Loader Only
a. Measure both arms. Each arm should extend 0.32 - 0.4" (8 - 12mm) from Platten Wall.
7. Actuate and measure arm several times to ensure arm does not drag on shield or platen.
3
VERIFICATION PROCEDURESVP - 10.1 Tube Positioning Arm Check
Search Book TOC Go Back
Special Tools
DESCRIPTION
None
"VP - 3.8 Rack to Laser Shield Check" (Page
QTY
PN
9140234B-June 1997
Figure
3-39).
3 - 133

Advertisement

loading

This manual is also suitable for:

Cell-dyn 3500