h. Mixing Head should fit completely into Tool without shifting tool or Rack . No Play between
Tool and Mixing Head. If Check Fails, go to
3-85).
G Loader [Europe]
a. Put Loader in Manual Mode.
Press and Hold MAN and START.
1.
Turn Power ON, hold keys down until BEEPING stops.
2.
b. Move X-Axis Solenoids to Left End Stop.
c. Insert Rack Guide Alignment Tool in Right End of Platen
d. Load Sarstedt Tube in Position # 4 of Rack and Place Rack on Left End of Platen
3-40).
e. Press (X
) to move Rack into cutout. Tube should be under Mixing Paddle
f. Press (Z
) to lower Mixing Head onto Tube.
g. Check Alignment of Tube.
Press and hold (R) to Rotate Tube.
1.
Verify Tube is Centered in Rack while rotating
2.
If Check Fails, go to
3.
If Check is OK, go to
4.
3
VERIFICATION PROCEDURESVP - 6.1 Mixing Head Position Check
Search Book TOC Go Back
"VP - 6.2 Mixing Head Position Adjustment" (Page
"VP - 6.2 Mixing Head Position Adjustment" (Page
"VP - 6.3 Mixing Home Sensor Check/Adjustment" (Page
(Figure
3-38).
(Figure
3-40).
9140234B-June 1997
(Figure
(Figure
3-38).
3-85).
3-89).
3 - 83

Advertisement

loading

This manual is also suitable for:

Cell-dyn 3500