®
CELL-DYN
3/35 Sample Loader TS Guide
VP - 1A Power Supply Check [CE MARK]
Purpose: Perform this procedure to verify operation of CE Mark Loader Power Supplies.
1. Ensure Line Fuse is Correct, see
2. Turn Power ON.
3. Verify LEDs flash and Beeper sounds.
4. Verify Barcode Reader PWR LED ON.
5. Measure voltages at CN1 and U19 on CPU Main Board (see
3
VERIFICATION PROCEDURESVP - 1A Power Supply Check [CE MARK]
Search Book TOC Go Back
Special Tools
DESCRIPTION
None
Table 3 -
3.
Table 3 - 3
Voltage
120VAC
1.6A FB 250V (5x20mm)
220/240 VAC 2.0A SB 250V (5x20mm)
QTY
PN
Fuse Type
Table 3 - 4
9140234B-June 1997
and
Figure
3-3).
3 - 13