®
CELL-DYN
3/35 Sample Loader TS Guide
5. Put tube in position #1 of Rack #1 (closest to tower),
6. Push (Y) to move racks toward tower.
7. MAN LED should flash with tube in #1 position and Rack #1 under tower
8. Slowly lean tube side to side, front to back, and rotate tube. MAN LED should continue to flash.
Ensure LED flashes when tube leans to the right.
9. Move tube to position #1 of Rack #2. MAN LED should be OFF
10.Lean tube toward Beam Block, "MAN" LED should be OFF. If either check fails, go to
Tube Detect Sensor (Beam Block) Adjustment" (Page
3
VERIFICATION PROCEDURESVP - 5.1 Tube Detect Sensor (Beam Block) Check
Search Book TOC Go Back
Figure
3-32.
3-70).
9140234B-June 1997
(Figure
3-32).
(Figure
3-32).
"VP - 5.2
3 - 68