9.1.3 Deep battery test

The battery test takes approx. 3 minutes and should be performed only if:
There are no alarm conditions
The battery is fully charged
Mains is present.
The battery testing can be carried out independently of the operation mode (OFF-LINE or ON-LINE)
and whether or not the load is connected. The battery test procedure can be performed from the UPS
display, in the service setup mode.

9.1.4 Battery maintenance, disposal and recycling

The battery maintenance shall be done by a certified Service
Partner.
To ensure an optimum operation of the UPS system and a
continuous and efficient protection of the connected load it is
recommended to check the batteries every 12 months.
Batteries contain dangerous substances that will harm the
environment if thrown away. If you change the batteries yourself,
call qualified organizations for battery disposal and recycling.

9.2 Troubleshooting

9.2.1 Alarms

In the event of an alarm condition the red LED Indicator "Alarm" and the audible alarm will turn on. In
this case proceed as follows:
1. Silence the audible alarm by pressing the button "Reset".
2. Identify the cause of the alarm condition using the EVENT LOG in the MAIN menu.
3. In case of doubt please contact the nearest service center.
4. Fault identification and rectification information is given on the following pages.

9.2.2 Menu, commands, event log and measurements

In the chapter 6 there is a detailed description of the menu, commands, event log and measurements
that can be operated and displayed on the LCD. The list of alarms and messages are shown below
Modifications reserved
Page 74/79
Fig 9.1.4-1: Battery maintenance,
disposal and recycling

Advertisement

Table of Contents
loading

Table of Contents