7.3

Deep battery test

The battery test takes approx. 3 minutes and should be performed only if:
There are no alarm conditions
The battery is fully charged
Mains is present.
The battery testing can be carried out independently of the operation mode (OFF-LINE or ON-LINE)
and whether or not the load is connected. The battery test procedure can be performed from the UPS
display, in the service setup mode.
7.4

Battery maintenance, disposal and recycling

The battery maintenance shall be done by a certified
Service Partner.
To ensure an optimum operation of the UPS system and
a continuous and efficient protection of the connected
load it is recommended to check the batteries every 12
months.
Batteries contain dangerous substances that will harm
the environment if thrown away. If you change the
batteries yourself, call qualified organizations for battery
disposal and recycling.