BATTERIES AND STORAGE SITE PLANNING AND POSITIONING 1.4.1 PLANNING BEFORE THE INSTALLATION 1.4.2 POSITIONING OF UPS AND BATTERY CABINET ELECTRICAL INSTALLATION 1.5.1 PREPARATION FOR THE INPUT CABLING 1.5.2 INSTALLATION CHECKLIST 04-3004_S0_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 3/8 ABB Printed in Switzerland – Modifications reserved...
Page 4
RECOMMENDED CABLE SECTIONS & FUSE RATINGS 2.1.3 CONNECTION DIAGRAM POWERSCALE FRONT AND REAR VIEW 2.2.1 FRONT AND REAR VIEW OF POWERSCALE CABINET A 2.2.2 FRONT AND REAR VIEW OF POWERSCALE CABINET B 2.2.3 FRONT AND REAR VIEW OF POWERSCALE CABINET C BATTERY CONNECTIONS 2.3.1...
Page 6
STANDARD BATTERY CONFIGURATION 10.11 INSTALLATION PLANNING 10.11.1 HEAT DISSIPATION PER UPS RANGE WITH NON-LINEAR LOAD 10.12 WIRING AND BLOCK DIAGRAMS FOR ALL UPS FRAMES 10.12.1 TERMINAL CONNECTIONS OVERVIEW 10.12.2 INPUT FEED RATINGS 04-3004_S0_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 6/8 ABB Printed in Switzerland – Modifications reserved...
Page 7
UPS. The reader is expected to know the fundamentals of electricity, wiring, electrical components and electrical schematic symbols CAREFULLY READ THE USER MANUAL BEFORE OPERATING OR WORKING ON THE UPS. 04-3004_S0_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 7/8 ABB Printed in Switzerland – Modifications reserved...
Page 8
It offers 7 different power ranges: 10-15-20-25-30-40-50kVA in three different cabinet sizes. Up to 20 UPS can be paralleled together to achieving any redundant power capacity with common or separate battery configuration. 04-3004_S0_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 8/8 ABB Printed in Switzerland – Modifications reserved...
There is a risk of electric shock present, and you should observe associated warnings. The UPS contains high voltages. Caution Risk of explosion of battery if replaced by an incorrect type. Dispose of used batteries according to the instruction. 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 2/20 ABB Printed in Switzerland – Modifications reserved...
CIRCUIT BREAKERS. THE SERVICE PERSONNEL HAS TO BE INFORMED ABOUT DANGEROUS VOLTAGES. THE WARNING PANELS MUST CONTAIN THE FOLLOWING TEXT: “ BEFORE STARTING WITH THE MAINTENANCE WORK ON THE CIRCUIT BREAKERS MAKE SURE THE UPS IS ISOLATED WARNING! 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 3/20 ABB Printed in Switzerland – Modifications reserved...
Please note the type code and the serial number of the equipment and contact your nearest agent certified by the manufacturer. The Code and the serial no. are shown on the nameplate see Section 1, 1.3.4 Nameplate and Identification 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 4/20 ABB Printed in Switzerland – Modifications reserved...
The product described in this manual is a transformerless Uninterruptible Power System (UPS). It is a true online, continuous duty, double conversion, solid state, three-phase system, providing conditioned and uninterruptible AC power to protect the customer’s load from all nine power failures. 1.2.1 MECHANICAL CHARACTERISTICS POWERSCALE 10-20KVA CABINET A PowerScale Cabinet A Power range Dimensions (WxHxD) 345x720x710...
1.2.6 SINGLE/PARALLEL CONFIGURATIONS Single UPS Configuration: Parallel UPS Configurations: It is possible to parallel a PowerScale UPS (up to 20 units) in order to increase power capacity or for power redundancy purpose. 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 8/20 ABB Printed in Switzerland – Modifications reserved...
OTHER CLAIM FOR SHIPPING DAMAGE MUST BE FILED IMMEDIATELY TOO NOTE! AND THE CARRIER MUST BE INFORMED WITHIN 7 DAYS OF RECEIPT OF THE EQUIPMENT. THE PACKING MATERIALS SHOULD BE STORED FOR FURTHER INVESTIGATION. 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 9/20 ABB Printed in Switzerland – Modifications reserved...
4) Add the enclosed ramp at the rear side of the cabinet and roll the UPS down (only for cabinets A&B); 5) Remove the UPS from the pallet with a forklift (for cabinet C). HEAVY ! 4) only A&B HEAVY ! 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 10/20 ABB Printed in Switzerland – Modifications reserved...
C at the front behind the cover. TYPE PRODUCT DESCRIPTION DIMENSIONS PowerScale 10-20 kVA Cabinet A (345x720x710mm) PowerScale 10-25 kVA Cabinet B (345x1045x710mm) PowerScale 25-50 kVA Cabinet C (440x1400x910mm) 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 11/20 ABB Printed in Switzerland – Modifications reserved...
If the packing container is removed protect the UPS from dust. THE UPS SYSTEM, THE BATTERY CABINET AND THE BATTERIES ARE HEAVY AND MAY TIP DURING TRANSPORTATION CAUSING SERIOUS INJURY IF UNPACKING INSTRUCTIONS ARE NOT CLOSELY FOLLOWED. NOTE! 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 12/20 ABB Printed in Switzerland – Modifications reserved...
THE UPS CONTAINS HIGH DC VOLTAGES. A QUALIFIED PERSON MUST DO THE CONNECTIONS BETWEEN THE UPS AND THE EXTERNAL BATTERY CABINET(S). THE BATTERY CABINET IS CONNECTED ELECTRICALLY IN PARALLEL WITH THE INTERNAL BATTERIES OF THE UPS. WARNING! 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 13/20 ABB Printed in Switzerland – Modifications reserved...
Page 22
50 / 800 mm 0 / 800 mm battery replacement in case the unit cannot be pulled forward Side clearance L for ventilation (natural air-exchange) 50 mm 50 mm 0 mm 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 14/20 ABB Printed in Switzerland – Modifications reserved...
If you have to use for other reason a 4-pole switch, you have to be aware that, NOTE! when open, the system - UPS and all downstream equipment - are floating against the PE. 230V 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 15/20 ABB Printed in Switzerland – Modifications reserved...
NOTE: The UPS is provided with facilities for both single feed (one common input cable for rectifier and bypass) and dual feed (separate input cable for rectifier and bypass). 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 16/20 ABB Printed in Switzerland – Modifications reserved...
Procedure to convert from Single to Dual Input Feed for Cabinet C Simply unscrew and remove the Terminal Bridges between 1L1-2L1, 1L2-2L2, 1L3-2L3, as shown in the picture below. UPS TERMINAL UPS TERMINAL Rectifier Bypass 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 17/20 ABB Printed in Switzerland – Modifications reserved...
Page 26
L2: unplug from FA9 and reconnect to FA24, L3: unplug from FA11 and reconnect to FA25. Please refer to the following pictures and the schematic below: FA11 FA25 FA25 FA25 FA24 FA24 FA24 FA23 FA23 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 18/20 ABB Printed in Switzerland – Modifications reserved...
Remove the terminal cover of the UPS. Connect the output power cable coming from the LV-Distribution Board to the terminals of the UPS as shown in drawing in Section-2, chapter 2.1.3 (Front view of the PowerScale) 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 19/20 ABB Printed in Switzerland – Modifications reserved...
Any optional accessories are mounted in their installed location and properly wired. Summary alarms and/or building alarms are wired appropriately. (OPTIONAL) Start-up and operational checks performed by certified service personnel. All network connections are completed. 04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 20/20 ABB Printed in Switzerland – Modifications reserved...
Page 29
2.1.3 CONNECTION DIAGRAM POWERSCALE ..................4 FRONT and REAR VIEW ..........................5 2.2.1 FRONT AND REAR VIEW OF POWERSCALE CABINET A ............... 5 2.2.1.1 Front and Rear View PowerScale 10-20kVA in Cabinet A and Connection Terminals ....5 2.2.2 FRONT AND REAR VIEW OF POWERSCALE CABINET B ............... 6 2.2.2.1...
[quantity x mm [quantity x mm (+ / N / - ): 35 mm 3 x 35 5 x 16 5 x 16 5 x 16 16 mm 1 x 16 04-3004_S2_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 2/15 ABB Printed in Switzerland – Modifications reserved...
3L1, 3L2, 3L3 + N: 35 mm 3 x 35 4 x 35 4 x 35 4 x 35 16 mm 1 x 16 1 x 16 1 x 16 1 x 16 04-3004_S2_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 3/15 ABB Printed in Switzerland – Modifications reserved...
4 x 25 3 x 25 3 x 80 3 x 80 3 x 100 1 x 16 1 x 16 1 x 16 1 x 16 (PE): (PE): (PE): (PE): 04-3004_S2_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 4/15 ABB Printed in Switzerland – Modifications reserved...
Section-2 FRONT and REAR VIEW 2.2.1 FRONT AND REAR VIEW OF POWERSCALE CABINET A 2.2.1.1 Front and Rear View PowerScale 10-20kVA in Cabinet A and Connection Terminals FRONT VIEW REAR VIEW 9/10 Power Management Display (PMD) of POWERSCALE PC Interface (Slot 1 Option) JD1/RS232 Sub D9/female Interface (UPS system to computer) (see section 3 / 1.1)
NOTE: Set-up the correct number of battery blocks on Control Panel (Menu: Service-Set-Up). Cabinet C (max 144 blocks, 3x48 7/9Ah or max. 48 blocks 28Ah) PS-Cabinet-C- PS-Cabinet-C- PS-Cabinet-C- PS-Cabinet-C- Standard 48x28Ah 96x9Ah 144x9Ah 04-3004_S2_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 8/15 ABB Printed in Switzerland – Modifications reserved...
24 blocs 28 blocs 32 blocs 36 blocs Limit batt min B Cabinet A: max 1 x 48 x 7/9Ah batteries Cabinet B: max 2 x 48 x 7/9Ah batteries 04-3004_S2_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 9/15 ABB Printed in Switzerland – Modifications reserved...
Page 38
Limit batt min C 24 blocs 32 blocs 40 blocs 46 blocs Cabinet B: max 2 x 48 x 7/9Ah batteries Cabinet C: max 3 x 48 x 7/9Ah batteries 04-3004_S2_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 10/15 ABB Printed in Switzerland – Modifications reserved...
Page 39
Limit batt min C 18 blocs 26 blocs 32 blocs 36 blocs Cabinet C: max 3 x 48 x 7/9Ah batteries 04-3004_S2_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 11/15 ABB Printed in Switzerland – Modifications reserved...
Page 40
Limit batt min C 30 blocs 34 blocs 40 blocs 46 blocs Cabinet C: max 3 x 48 x 7/9Ah batteries 04-3004_S2_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 12/15 ABB Printed in Switzerland – Modifications reserved...
5) Connect the corresponding + , N, - terminals between UPS and external battery cabinet according to drawing 2.3.1.3 Terminals for External Battery connection External Battery for separate Batteries per UPS + N - Figure. 4 Connection of external separate batteries 04-3004_S2_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 13/15 ABB Printed in Switzerland – Modifications reserved...
Page 42
The 3 links has to be installed between the following points. NW24170 / NW 24172 FA21 F1 / 2 NW24170 / NW 24172 FA20 F1 / 4 NW24170 / NW 24172 FA22 F1 / 6 04-3004_S2_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 14/15 ABB Printed in Switzerland – Modifications reserved...
Page 43
Section-2 This page left intentionally blank 04-3004_S2_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 15/15 ABB Printed in Switzerland – Modifications reserved...
(For details see user manual Multidrop kit). The connector JR1 is a standard RJ45 port. Cabinet A&B 9/10 Cabinet C 9/10 Figure 3 Distribution Interfaces Cabinets A,B and C 04-3004_S3_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 4/6 ABB Printed in Switzerland – Modifications reserved...
Page 48
ONLY For paralleling cabinets use optional adapter: Parallel BUS - Input Connector Parallel BUS - Output Connector SNMP Slot for optional SNMP card ONLY 10 Modem Slot for optional Modem/Ethernet card ONLY 04-3004_S3_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 5/6 ABB Printed in Switzerland – Modifications reserved...
Page 49
Section-3 This page left intentionally blank 04-3004_S3_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 6/6 ABB Printed in Switzerland – Modifications reserved...
Monitor the input and output U, I, f, P, Battery runtime; To perform commands like start-up and shut-down of UPS and Load transfer from INVERTER to BYPASS and vice-versa; 04-3004_S4_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 2/8 ABB Printed in Switzerland – Modifications reserved...
IN THE CASE THAT THE PARALLEL UPS SYSTEM HAS TO BE TURNED OFF, THEN BOTH ON/OFF BUTTONS ON ALL UPS HAVE TO BE PUSHED. IN THIS CASE THE POWER SUPPLY TO THE LOAD WILL BE NOTE! INTERRUPTED 04-3004_S4_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 3/8 ABB Printed in Switzerland – Modifications reserved...
Various settings can be performed by the user: Date/Time, automatic battery test, etc. SET-UP SERVICE SET-UP SERVICE Various adjustments can be performed by the service staff NO MORE MENU 04-3004_S4_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 4/8 ABB Printed in Switzerland – Modifications reserved...
LCD-DISPLAY LOAD TO INVERTER Transfer Load to inverter LOAD TO BYPASS LOAD TO BYPASS Transfer Load to bypass. PERFORM BATT.TEST PERFORM BATT.TEST Battery Test NO MORE COMMANDS 04-3004_S4_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 5/8 ABB Printed in Switzerland – Modifications reserved...
SET-UP SERVICE This Menu is reserved for certified service PASSWORD engineers. It is not to be used by End-Users PASSWORD. Type in password Password is necessary to enter: Service Manual 04-3004_S4_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 6/8 ABB Printed in Switzerland – Modifications reserved...
The "Bypass-Mode”, is recommended only if the loads can tolerate interruptions of 3-5 ms (transfer time from Bypass Mode to ON-LINE Mode). TO HAVE TO MOST ESSENTIAL SECURITY LEVEL, WE RECOMMEND TO RUN THE UPS ON NORMAL OPERATION MODE, MEANS UPS MODE. NOTE! 04-3004_S4_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 7/8 ABB Printed in Switzerland – Modifications reserved...
In redundant parallel configurations it is used to isolate a unit from the parallel system without the need of transferring the load to bypass. POSITION EFFECT Normal Operation (Load supplied by UPS) UPS is isolated from Parallel Bus for maintenance or module replacement (UPS is not supplying load) 04-3004_S4_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 8/8 ABB Printed in Switzerland – Modifications reserved...
Page 58
START-UP PROCEDURE ........................2 5.1.2 SHUTDOWN PROCEDURE ......................... 4 5.1.3 LOAD TRANSFER: FROM INVERTER OPERATION TO MAINTENANCE BYPASS ......5 5.1.4 LOAD TRANSFER: FROM MAINTENANCE BYPASS TO INVERTER OPERATIONS ...... 6 04-3004_S5_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 1/6 ABB Printed in Switzerland – Modifications reserved...
LED indicator will appear as shown below: LED Indicator Colour LINE 1 Green LINE 2 Green BYPASS INVERTER Green BATTERY Flashing Green Scroll through the menu measurement and check their correctness Check battery polarity and voltage. 04-3004_S5_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 2/6 ABB Printed in Switzerland – Modifications reserved...
Page 60
On control panel go to Menu COMMANDS, choose command “LOAD TO INVERTER” and transfer the load to inverter. On all LCD’s: “LOAD PROTECTED” will appear Check the output Voltages and Currents once again. THE LOAD IS NOW PROTECTED BY THE POWERSCALE 04-3004_S5_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 3/6 ABB Printed in Switzerland – Modifications reserved...
Open the mains fuses/breaker in the building distribution panel. MAKE SURE THE INTERNAL DC-CAPACITORS (ELCO) HAVE BEEN DISCHARGED WAITING AT LEAST 10 MINUTES. NOTE! THE POWERSCALE IS NOW VOLTAGE FREE. 04-3004_S5_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 4/6 ABB Printed in Switzerland – Modifications reserved...
Open battery fuses/breakers on the external battery cabinets or racks. THE UPS SYSTEM IS STILL POWERED (DANGEROUS VOLTAGE). NOTE! THE LOAD IS NOW SUPPLIED BY MAINS AND IS THEREFORE NOT PROTECTED THROUGH THE UPS NOTE! 04-3004_S5_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 5/6 ABB Printed in Switzerland – Modifications reserved...
This will transfer the LOAD to Inverter on the complete system (all units). On LCD panel “LOAD PROTECTED” will appear. THE LOAD IS NOW SUPPLIED BY INVERTER POWER AND IS PROTECTED 04-3004_S5_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 6/6 ABB Printed in Switzerland – Modifications reserved...
Page 64
ECO-MODE (BYPASS MODE) in Parallel Systems ..............5 6.1.3 COMMISSIONING OF PARALLEL CONFIGURATION ............... 6 6.1.3.1 Start-up of a Parallel Configuration ....................6 6.1.3.2 Shutdown of Parallel Configuration ....................6 04-3004_S6_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 1/6 ABB Printed in Switzerland – Modifications reserved...
POWERSCALE. If in a parallel UPS system the load is transferred to the BYPASS (load on mains) and if the mains fails, the UPS’s will all be automatically transferred to inverter within 5msec. 04-3004_S6_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 2/6 ABB Printed in Switzerland – Modifications reserved...
Master-Slave Master-Slave Master-Slave Master-Slave SW2-2 Master-Slave Master-Slave Output Input Output Input Output Input Output Input Figure 1.2.Connection of the Bus Lines when paralleling UPS-Cabinets by means of Parallel Adapters. 04-3004_S6_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 3/6 ABB Printed in Switzerland – Modifications reserved...
ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF After having set the SW1-9 on all the POWERSCALE - Cabinets correctly the UPS’s may be commissioned 04-3004_S6_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 4/6 ABB Printed in Switzerland – Modifications reserved...
5msec. In order to provide the load with maximum protection the manufacturer always recommends that the load be supplied by the inverter (ON-LINE-Mode). 04-3004_S6_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 5/6 ABB Printed in Switzerland – Modifications reserved...
Paragraph are to be performed only after the load has been disconnected. To perform a complete shutdown of a Parallel Configuration proceed in analogy to the shutdown procedures described in Paragraph 1.2 of section 5. 04-3004_S6_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 6/6 ABB Printed in Switzerland – Modifications reserved...
Page 70
CONTENTS SECTION-7 MAINTENANCE ............................2 7.1.1 USER RESPONSIBILITIES ........................2 7.1.2 PREVENTATIVE MAINTENANCE ....................... 2 7.1.3 DEEP BATTERY TEST ........................2 7.1.4 BATTERY MAINTENANCE, DISPOSAL AND RECYCLING ............... 3 04-3004_S7_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 1/4 ABB Printed in Switzerland – Modifications reserved...
Page 71
The battery test takes approx. 3 minutes and should be performed only if: • there are no alarm conditions • the battery is fully charged • mains is present. 04-3004_S7_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 2/4 ABB Printed in Switzerland – Modifications reserved...
Page 72
12 months. Batteries contain dangerous substances that will harm the environment if thrown away. If you change the batteries yourself, call qualified organizations for battery disposal and recycling. 04-3004_S7_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 3/4 ABB Printed in Switzerland – Modifications reserved...
Page 73
Section-7 This page left intentionally blank 04-3004_S7_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 4/4 ABB Printed in Switzerland – Modifications reserved...
Page 75
This alarm is only displayed if the UPS is on supplied by mains. Maintenance Bypass. CLOSED In case of alarms not included in the list above, please contact the nearest certified service centre for assistance. 04-3004_S8_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 2/2 ABB Printed in Switzerland – Modifications reserved...
Page 76
WAVEMON SHUTDOWN AND MANAGEMENT SOFTWARE ............3 9.1.4.1 Why is UPS Management important?................... 3 9.1.4.2 WAVEMON Shutdown and Monitoring Software ................3 9.1.5 SNMP CARD/ADAPTER FOR NETWORK MANAGEMENT /REMOTE MONITORING ..... 5 04-3004_S9_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 1/6 ABB Printed in Switzerland – Modifications reserved...
REMOTE SHUT DOWN SWITCH Cabinets A&B (N.C. = Normally Closed) Remote shut down (X1) X1/7 X1/8 Cabinet C Terminal Block Fig 1.2 Drawing of the wiring for the REMOTE SHUT DOWN SWITCH. 04-3004_S9_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 2/6 ABB Printed in Switzerland – Modifications reserved...
DRY PORT (Relays) on Terminal block X2 and RS232 port JD11 on the communication card. The software packet consists of a CD ROM for most diffused operating systems (Windows, Unix, OS/2, DEC VMS, Novell, Apple), a standard connection and a user manual. 04-3004_S9_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 3/6 ABB Printed in Switzerland – Modifications reserved...
Page 79
The main principle is: let introduce a shutdown of a Server only when strictly necessary. A correct Parallel Handling has therefore to manage a parallel system as a whole and always considering redundancy. Following statements apply: 04-3004_S9_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 4/6 ABB Printed in Switzerland – Modifications reserved...
(downtime) or by a countdown timer which is started at the beginning of the alarm. A shut down is therefore possible without extra input from the operator, and is fully software controlled. 04-3004_S9_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 5/6 ABB Printed in Switzerland – Modifications reserved...
Page 81
Thanks to RCCMD it is possible to execute a shutdown in an heterogeneous multiplatform network. The new release RCCMD2 is an application available for all Operating Systems, analogous to PMC-Software. Our SNMP Interfaces are compatible to RCCMD. 04-3004_S9_OPM_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 6/6 ABB Printed in Switzerland – Modifications reserved...
It offers 7 different power ranges: 10-15-20-25-30-40-50kVA in three different cabinet sizes. Up to 20 UPS can be paralleled together and provide any redundant power capacity with common or separate battery configuration. 04-3004_S10_TDS_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 3/20 ABB Printed in Switzerland – Modifications reserved...
Section-10 10.2 TECHNICAL CHARACTERISTICS 10.2.1 MECHANICAL CHARACTERISTICS POWERSCALE 10-20kVA Cabinet A PowerScale Cabinet A Power range Dimensions (WxHxD) 345x720x710 Weight without battery Weight with battery with 48 block of 7Ah with standard packaging Graphite grey Pulverlacke No. 4222903402 serie Colour 09RCCAT1 (RAL 7024) 10.2.2 MECHANICAL CHARACTERISTICS POWERSCALE 10-25kVA Cabinet B...
3 : 1 AC – AC EFFICIENCY with Linear load up to cos 10.5.1 GRAPH: φ Linear Load (cosφ=1) 95.5 95.5 94.5 Load % NOTE: Depending on power rating 04-3004_S10_TDS_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 8/20 ABB Printed in Switzerland – Modifications reserved...
UPS or load transfer from UPS to BYPASS and vice-versa and finally it serves for the DIAGNOSIS (SERVICE MODE) for adjustments and testing. 04-3004_S10_TDS_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 10/20 ABB Printed in Switzerland – Modifications reserved...
- or specific values from the single modules. External SNMP-Adapter External SNMP-Ad Concept Ethernet power Ethernet Internal SNMP-Card Internal SNMP-Card Techni Specifi cations pter 04-3004_S10_TDS_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 12/20 ABB Printed in Switzerland – Modifications reserved...
24 blocs 28 blocs 32 blocs 36 blocs Limit batt min B Cabinet A: max 1 x 48 x 7/9Ah batteries Cabinet B: max 2 x 48 x 7/9Ah batteries 04-3004_S10_TDS_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 13/20 ABB Printed in Switzerland – Modifications reserved...
Page 95
Limit batt min C 24 blocs 32 blocs 40 blocs 46 blocs Cabinet B: max 2 x 48 x 7/9Ah batteries Cabinet C: max 3 x 48 x 7/9Ah batteries 04-3004_S10_TDS_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 14/20 ABB Printed in Switzerland – Modifications reserved...
Page 96
Limit batt min C 18 blocs 26 blocs 32 blocs 36 blocs Cabinet C: max 3 x 48 x 7/9Ah batteries 04-3004_S10_TDS_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 15/20 ABB Printed in Switzerland – Modifications reserved...
Page 97
Limit batt min C 30 blocs 34 blocs 40 blocs 46 blocs Cabinet C: max 3 x 48 x 7/9Ah batteries 04-3004_S10_TDS_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 16/20 ABB Printed in Switzerland – Modifications reserved...
50 / 800 mm 0 / 800 mm battery replacement in case the unit cannot be pulled forward Side cl. L for ventilation (natural air-exchange) 50 mm 50 mm 0 mm 04-3004_S10_TDS_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 17/20 ABB Printed in Switzerland – Modifications reserved...
3L1, 3L2, 3L3 + N + PE [Nm] [quantity x mm [quantity x mm [quantity x mm [quantity x mm 4 x 16 5 x 16 5 x 16 5 x 16 04-3004_S10_TDS_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 18/20 ABB Printed in Switzerland – Modifications reserved...
Page 100
3L1, 3L2, 3L3 + N: 35 mm 3 x 35 4 x 35 4 x 35 4 x 35 16 mm 1 x 16 1 x 16 1 x 16 1 x 16 04-3004_S10_TDS_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 19/20 ABB Printed in Switzerland – Modifications reserved...
4 x 25 3 x 25 3 x 80 3 x 80 3 x 100 1 x 16 1 x 16 1 x 16 1 x 16 (PE): (PE): (PE): (PE): 04-3004_S10_TDS_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 20/20 ABB Printed in Switzerland – Modifications reserved...