Removing Internal Faceplates in the Power Distribution Panel

Figure 2-2 Removing the Internal Faceplates on the Power Distribution Panel

Clearance Requirements

Figure 2-3 Clearance Requirements

975-0239-01-01
Provide a minimum clearance of 6 inches (15 cm)—12 inches is preferred—around the
top and 6 inches (15 cm) at the bottom of the inverter for ventilation. There must be at
least three feet of clearance in front of the inverter. Ensure that the vents are not obstructed
with foreign objects and that the minimum clearances are met.
This manual for use by qualified personnel only
To remove the upper faceplate,
remove the 4 screws holding the
plate in place.
To remove the lower faceplate,
remove the 4 screws holding the
plate in place.
Pre-Installation