Rotax 912 iSc Maintenance Manual page 52

912 i series
Hide thumbs Also See for 912 iSc:
Table of Contents

Advertisement

- In order to demonstrate continued airworthiness, an engine must be
25-hr.
check
inspected after the first 25 hours of operation.
- The checks performed at the 25 hr. inspection are the same as for the
100 hr. inspection. This applies both to newly delivered engines and to
overhauled engines.
Effectivity: 912 i Series
Edition 1/Rev. 0
BRP-Powertrain
MAINTENANCE MANUAL
05-20-00
page 4
January 01/2012

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 is

Table of Contents