Pocket Finishing (Cycle 212) - HEIDENHAIN TNC 370 User Manual

Conversational programming
Table of Contents

Advertisement

8
Cycles
4
8.3
Cycles for Milling
Pockets,
Studs and Slots
POCKET
FINISHING
(Cycle 212)
Process
l
The TNC moves the tool in the Z axis to the setup clearance,
or-if
this
has been specified-to
the 2nd setup clearance
and subsequently
to
the center of the pocket.
l
From the center of the pocket the tool moves in the working
plane to
the starting point for machining.
For calculating
the starting point, the
TNC takes into account
the finishing
allowance
and the tool radius.
l
If the tool is at the 2nd setup clearance,
the TNC moves the tool in
rapid traverse to the setup clearance
and from there at the positioning
feed rate to the first infeed depth.
l
The tool subsequently
moves tangentially
to the contour
of the finished
part and, using climb milling, machines
one revolution.
l
After this, the tool moves tangentially
away from the contour,
back to
the starting point in the working
plane.
l
This process is repeated
until the programmed
depth is reached.
l
At the end of the cycle the TNC moves the tool at rapid traverse to the
setup clearance
or-
if this has been specified-to
the 2nd setup
1
clearance
and subsequently
to the center of the pocket (end position
=
Fig. 8.12:
POCKET
FINISHING
cycle
starting
position).