Datum Shift (Cycle 7) - HEIDENHAIN TNC 370 User Manual

Conversational programming
Table of Contents

Advertisement

8
Cycles
-
-
.~
8.7
Cycles for Coordinate
Transformations
DATUM
SHIFT
(Cycle 7)
Application
With the aid of a datum shift, machining
operations
can be repeated
at
various locations
on the workpiece.
If the datum shift is referenced
to
the machine
datum, you can clamp as many workpieces
as desired on
the machine
table, calculate the distance from the machine
datum to the
datum of each workpiece
and enter these values directly into the part
program
with cycle 7.
Activation
When the DATUM
SHIFT cycle has been defined,
all coordinate
data are
based on the new datum. Shifted axes are identified
in the status.
input
data
Only the coordinates
of the new datum need to be entered.
Absolute
values are based on the workpiece
datum. If the coordinates
of the new
datum are to be referenced
to the machine
datum, press the REF soft
key on the second soft-key row at the beginning
of the cycle definition.
The TNC then identifies the first block of the cycle with REF.
Incremental
values are based on the last valid datum: this datum can
itself be shifted
Fig. 8.69:
Datum
shift,
absolute
Cancellation
To cancel a datum shift, enter the datum shift coordinates
X = 0, Y = 0
and Z = 0.
Fig. 8.68:
Activation
of the datum
shift
Fig. 8.70:
Datum
shift,
incremental
@
When
combining
transformations,
program
the
&rum shift
first.
TNC 370
8-61

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents