Drilling (Cycle 200) - HEIDENHAIN TNC 370 User Manual

Conversational programming
Table of Contents

Advertisement

8
Cycles
L-
8.2
Drilling Cycles
DRILLING
(Cycle 200)
L-
.-
* Program a po&ioning block far
the starting
point @mle center) in the w&&g plane
with radiuI; compensation
IW.
* The algetsraic sign fer cycle panmeter UPIll
defines
the
working dirwtion.
* Cycle 200 is an abbrevi&ed
version of the universal drilling Cycle 203 (sea pge
8-I 0). Internally,
however,
the
full range
af
functions
of Cycle 203 is available, The corresponding
paratieters can-if
rsquir&-
be
wfoaded
after cycle definMm. FOF this. use the Q
parameter
function
FNQ: ASSIGN.,
Process:
l
The TNC positions
the tool in the 2 axis at rapid
traverse to the programmed
setup clearance
above the workpiece
surface.
l
The tool drills at the programmed
feed rate to
the first pecking depth.
l
The TNC moves the tool at rapid traverse FMAX
back to the setup clearance,
dwells there-if
this has been specified-and
then moves, again
at rapid traverse, to 0.2 mm above the first
pecking
depth.
l
The tool subsequently
drills at the programmed
feed rate by a further pecking
depth.
l
The TNC repeats this sequence
until the pro-
grammed
total hole depth is reached.
l
From the bottom
of the hole, the tool moves at
FMAX to the setup clearance
or-if
this has
been specified-to
the second setup clearance.
Fig.
8.3:
DRILLING
cycle
fnput data
l
SET-UP
CLEARANCE
Q200 (incremental
value):
Distance between
tool tip and workpiece
surface. Enter a positive
value.
l
DEPTH
Q201 (incremental
value):
Distance
between
workpiece
surface and bottom of hole (tip of the drill
taper).
l
FEED RATE FOR PECKING
0206:
Traversing
speed of the tool when drilling in mm/min.
l
PECKING
DEPTH
0202 (incremental
value):
lnfeed per cut. The TNC moves in one operation
to the DEPTH if:
-
PECKING DEPTH and DEPTH are identical
-
the PECKING DEPTH is greater than the DEPTH.
-
PECKING DEPTH = 0
Enter a positive value.
l
DWELL
TIME
AT TOP Q210:
Time in seconds
which the tool spends at setup clearance,
after the
TNC has withdrawn
it from the hole for chip breaking.
l
WORKPIECE
SURFACE
COORDINATE
0203
(absolute value):
Coordinate
of the workpiece
surface.
l
2ND SET-UP
CLEARANCE
0204 (incremental
value):
Z coordinate
at which no collision between
tool and workpiece
(clamp-
ing devices) can occur. Enter a positive value.
L
TNC 370
8-7
L

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents