8
Cycles
8.2
Drilling Cycles
UNIVERSAL
DRILLING
CYCLE (Cycle
203)
NW?:
l
Program
a positioning
block for the starting point thole center) in the working plane with radius compensation
RO.
* The algebtraic sign for cycle parametw
DEPTH defines the working
dire&an.
Process:
l
The TNC positions
the tool in the Z axis at rapid
traverse to the programmed
setup clearance
above the workpiece
surface.
l
The tool drills at the programmed
feed rate to
the first pecking depth.
l
If chip breaking
is specified,
the TNC moves the
tool back by 0.2 mm. If you are working
without
chip breaking,
the TNC moves the tool at the
retraction
feed rate back to the setup clearance,
dwells
there-if
this has been specified-and
then moves, again at rapid traverse, to 0.2 mm
above the first pecking depth.
l
The tool subsequently
drills at the programmed
feed rate by a further pecking depth.
l
The TNC repeats this sequence
until the pro-
grammed
total hole depth is reached.
l
The tool dwells
at the bottom
of the hole-if
Fig. 8.6:
Cycle sequence: UNIVERSAL DRILLING CYCLE
this has been specified-to
free run and is
withdrawn
at the retraction
feed rate to the
setup clearance
after the dwell time. If a second
setup clearance
has been programmed,
the TNC
moves the tool there at FMAX.
8-l 0
TNC 370