Pellet Or Pellet/Electric Combination Furnaces - PSG CADDY ALTERNA II Installation And Operating Instructions Manual

Pellet furnace
Table of Contents

Advertisement

THE INSTALLATION OF THIS CENTRAL HEATING SYSTEM MUST BE
PERFORMED BY A QUALIFIED TECHNICIAN.
THE RIGHT TO VOID ITS WARRANTY OR DENY TECHNICAL ADVICE IF
THE
FURNACE
PROFESSIONAL.
To receive full warranty coverage, you will need to show evidence of the date you purchased your furnace.
Keep your sales invoice. We also recommend that you register your warranty online at
Registering your warranty online will help us track rapidly the information we need on your furnace.

1 PELLET OR PELLET/ELECTRIC COMBINATION FURNACES

The Caddy Alterna II furnace was tested using the guidelines of the CSA B415.1-10 Standard.
To optimize the efficiency of your furnace, here are a few advice you should follow when installing or operating
your Caddy Alterna II.
Respect the local codes (when in doubt, consult your local dealer);
Make sure your furnace is installed according to the instructions on the certification label;
All controls and adjustments must be performed by a qualified technician. The blower speed must
conform to the recommendations of the local construction code concerning static pressure ranges in the
hot air plenum of the furnace.
IMPORTANT NOTE:
HAS
NOT
BEEN
REGISTER YOU WARRANTY ONLINE
http://www.caddyfurnaces.com/en/warranty/
PSG RESERVES ITSELF
SOLD
OR
6
INSTALLED
BY
A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pf09010

Table of Contents