Installing The Link Board Box And Electrical Wiring - PSG CADDY ALTERNA II Installation And Operating Instructions Manual

Pellet furnace
Table of Contents

Advertisement

5.10 INSTALLING THE LINK BOARD BOX AND ELECTRICAL WIRING

Note: The installation instructions in this section apply to a location of the controls to the right or to the left of the
furnace. The most accessible side is preferable to facilitate the connection of auxiliary equipment or for servicing.
The components to be installed are supplied in the furnace hopper.
Remove the link board
box cover.
Remove
the
four
screws found on the
desired installation side.
30

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pf09010

Table of Contents