5
Start Up
Drive Setup Procedure
The illustration below shows the basic setup procedure. Each step is explained more detailed
on the following pages.
YASKAWA Europe TOEP C710606 91B AC Drive L1000H - Quick Start Guide
Mechanical installation.
Main and control circuit wiring, including PT100 converter.
Apply main power on to the drive.
Adhere to safety messages concerning application of power.
Initialize the drive if necessary using parameter A1-03. Check in
"Verify" menu that nothing is modified.
Check the motor rotation direction.
Perform Auto-Tuning for motor parameters.
Enter pump, oil and lift data to P1-□□ and execute "Basic Calcula-
tions" (P4-01 = 1).
Make sure the elevator is ready to run and perform "Empty Car
Teach Run" for operation data (P4-01 = 2).
Perform a test run.
* Down travel (P2-□□)
* Dwell functions (P6-□□)
* Leveling control (P7-□□)
* Advanced tuning (P8-□□: compensation gains etc.).
Drive is ready to run the elevator
START
Fine tuning
5 Start Up
EN 19