Unpacking The Rmx; Unpacking The Rmx 1500; Unpacking The Rmx 2000 - Polycom DOC2560C Getting Started Manual

Polycom conference platform getting started guide
Table of Contents

Advertisement

Unpacking the RMX

Unpacking the RMX 1500

To unpack and lift the RMX 1500:
1
When you receive the RMX 1500 packing case, inspect the equipment
for damage and verify that the components match the packing slip.
2
Open the top cover of the packing case.
Two boxes are placed on the top Stratocell®, labelled:
— Installation Accessories. This kit contains the power cables and a
Disk-on Key (DOK).
— Rack Installation Accessories. This kit contains the accessories for
the 19"/23" racks as follows:
Write down the RMX's serial number that is on a sticker on the back of the unit.
It will be needed for product registration later in the process.
Table 2-2
19" & 23" Rack Installation Accessories Package
Item ID
MEC2791A-L0

Unpacking the RMX 2000

To unpack and lift the RMX 2000:
1
When you receive the RMX 2000 packing case, inspect the equipment
for damage and verify that the components match the packing slip.
2
Open the top cover of the RMX 2000 packing case and make sure that
the Installation Accessories kit contains the power cables and a USB
Key.
3
Remove the top cover, lift the RMX 2000 from the package and place
it on a flat surface.
Write down the RMX's serial number that is on a sticker on the back of the unit.
It will be needed for product registration later in the process.
Polycom RMX 1500/2000/4000 Getting Started Guide
Description
Chassis runner (60cm in length) for
rack installation on the RMX 1500.
19"/23" racks both require that these
runners be installed on the rack.
Quantity
2
2-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rmx 1500Realpresence rmx 4000Rmx 2000

Table of Contents