Run Post With Maximum Testing - Sun Oracle SPARC T3-1B Service Manual

Server
Hide thumbs Also See for SPARC T3-1B:
Table of Contents

Advertisement

Commands:
cd
set
show
->
Related Information
"POST Overview" on page 32
"Oracle ILOM Properties That Affect POST Behavior" on page 33
"Run POST With Maximum Testing" on page 37
"Interpret POST Fault Messages" on page 39
"Clear POST-Detected Faults" on page 40

▼ Run POST With Maximum Testing

This procedure describes how to configure the server module to run the maximum
level of POST.
1. Access the Oracle ILOM -> prompt:
See
"Access the SP (Oracle ILOM)" on page
2. Set the virtual keyswitch to diag so that POST will run in service mode.
-> set /SYS/keyswitch_state=diag
Set 'keyswitch_state' to 'Diag'
3. Reset the system so that POST runs.
There are several ways to initiate a reset. The following example shows a reset by
issuing commands that will power cycle the host.
-> stop /SYS
Are you sure you want to stop /SYS (y/n)? y
Stopping /SYS
-> start /SYS
Are you sure you want to start /SYS (y/n)? y
Starting /SYS
Note – The server module takes about one minute to power off. Type the show
/HOST command to determine when the host has been powered off. The console will
display status=Powered Off.
15.
Detecting and Managing Faults
37

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC T3-1B and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents