System Maintenance; Maintenance Recommendation; Opening The Control Panel [De] - Siemens FC7xx Operation Manual

Fire control panel / fire terminal
Table of Contents

Advertisement

11 System maintenance

11.1 Maintenance recommendation

11.2 Opening the control panel [DE]

Building Technologies
Fire Safety
Regular maintenance of the ↑ 'Site' is necessary in order to ensure the system will
function reliably.
The fire detection installation has a reminder function that informs you of imminent
maintenance. When the service reminder is displayed, regular maintenance by the
service technician is required.
Depending on national regulations, the maintenance intervals can be set
differently from the following maintenance recommendation.
You will find detailed instructions for maintaining the ↑ site in document
A6V10210416.
Please adhere to the local provisions.
Carry out the recommended maintenance work at regular intervals or have it
carried out by a service engineer.
Maintenance work
Testing detectors
Testing the control panel
Simulating alarm
Simulating fault
It is possible that the housing of the control panel may have to be opened for
maintenance work.
If a class 3 key safe (fire brigade key safe, FSD) forms part of the fire detection
installation, the door contact kit FCA2009-A1 must be installed in the housing of
the control panel.
The door contact kit triggers a 'Sabotage ALARM' if the cover cap is removed from
the control panel.
NOTICE
Sabotage ALARM by opening the control panel
Measures for 'Sabotage ALARM' are triggered unnecessarily.
Switch off sabotage evaluation before you open the control panel.
See also
1 Switching off sabotage evaluation [DE] [➙ 57]
System maintenance
Maintenance recommendation
Interval
Annually
Annually
Annually
Annually
A6V10211076_i_en_--
11
175 | 184
2015-12-15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ft724

Table of Contents