Yamaha FJR13AEV(C) Service Manual page 117

Hide thumbs Also See for FJR13AEV(C):
Table of Contents

Advertisement

1. Brake hose (front brake master cylinder to
hydraulic unit)
2. Right handlebar switch lead
3. Left handlebar switch lead
4. Left grip warmer lead
5. Hand shift switch lead
6. Right grip warmer lead
7. Main switch lead
8. Left horn (low)
9. Brake hose (hydraulic unit to left front brake
caliper)
10. Front wheel sensor lead
11. Brake hose (hydraulic unit to right front brake
caliper)
12. Brake hose (metering valve to right front brake
caliper)
13. Brake hose (hydraulic unit to front brake calipers)
14. Right horn (high)
15. Headlight (on/off)/grip warmer relay
16. Radiator fan motor relay
17. Main fuse
18. Brake light relay
19. YCC-S control relay
20. Positive battery lead
21. ABS test coupler
22. Throttle cable (accelerator cable)
23. Throttle cable (decelerator cable)
A. Route the right handlebar switch lead and right
grip warmer lead under the handlebar.
B. Route the left handlebar switch lead, left grip
warmer lead, and hand shift switch lead under the
handlebar.
C. Pass the hand shift switch lead, right grip warmer
lead, left grip warmer lead, right handlebar switch
lead, and left handlebar switch lead through the
guide.
D. Fasten the right handlebar switch lead, right grip
warmer lead, and main switch lead with a plastic
locking tie.
E. Temporarily tighten the brake hose joint bolt, union
bolt, and brake hose holder bolt in the proper
tightening sequence as shown. Then, tighten the
bolts to the specified torque, making sure to tighten
the brake hose joint bolt "1" last.
F. To front cowling wire harness
G. Install the horn L-shaped connectors so that the
leads are routed outward.
H. Fasten the grommet on the front wheel sensor lead
with the holder.
I.
Connect the coupler that has blue tape wrapped
around its leads to the radiator fan motor relay.
J. Install the ABS test coupler completely onto the
tab on the battery stay.
K. Pass the brake hose (front brake master cylinder to
hydraulic unit), right handlebar switch lead, right
grip warmer lead, and throttle cables through the
guide as shown in the illustration.
L. Fasten the right grip warmer lead to the throttle
cables with a plastic locking tie 10 mm (0.39 in) or
less from the end of the throttle cable boot. Face
the end of the plastic locking tie upward or
downward, and then cut off the excess end of the
tie.
CABLE ROUTING (FJR13AE)
M. Fasten the right handlebar switch lead, right grip
warmer lead, and main switch lead with a plastic
locking tie at the location shown in the illustration.
Position the buckle of the plastic locking tie under
the leads, with the end facing inward, and then cut
off the excess end of the tie.
2-68

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Fjr13av(c)

Table of Contents